This is Central construction Specification Following below:

Structure

RCC framed structure Designed for seismic zone III. 9”thk 1st quality brick for outer walls. 4.5”thk 1st quality brick for inner walls.Base Level minimum 2'6" based-on Exiting  Road Level

Flooring

24”X24” vitrified flooring for all rooms. 8”X 8” anti-skid ceramic tiles in toilets. 24”X24” Anti stain tiles in Kitchen.  24”x24” Rustic ceramic tiles in balcony.

Wall tiles

10”X14” ceramic tiles up to 7’0” height in toilets .  2’ ht dado ceramic tiles above granite platform in kitchen.

Kitchen

Black granite top kitchen platform with stainless steel sink

Joineries

Main Door : Seasoned Teak wood frame & door with Melamine finish.

Bedroom Doors : Imported Padak wood frame & designed ready made doors finished with enamel paint.

Toilet Doors : Imported Padak wood frame & FRP doors

Windows : Imported Padak wood frames & shutters with enamel paint.

Window Grills : MS flat window grills finished with zinc chromate non corrosive paint.

Electrical 

Siemens Modular switches, Havells Multi strand copper wire and MCB’s and ELCBs.

Provision for light, fan and power points.

A/C point in all rooms.

TV & telephone points in living.

2 way points in all bedrooms.

Provision for washing machine & geyser points.

Sanitation

Parryware / equalent EWC and wash basin in white/light color, Jaquar/equalent CP fittings with wall mixer.

Health faucet will be provided.

Wardrobe

RCC wardrobe in bedrooms and shelves in kitchen without shutters.

Painting

Internal walls : Finished with emulsion paint On putty.

External walls : Finished with exterior acrylic emulsion paint.

Water Supply

Bore well water in all tap points.

Packaged drinking water from RO plant.

Power Supply

3 phase power supply with automatic change over switch in each flat.

RMU transformer with advanced features.

Others 

Lights in Stair, around the buildings and terrace will be provided.

Bore well to a required depth.

Compound wall around the building.

Anti termite treatment as per norms.

Underground sump.

Sewage treatment plant.

Lift

8 passengers Johnson/equivalent lift with automatic rescue device.