This is Central construction Specification Following below:
Structure |
RCC framed structure Designed for seismic zone III. 9”thk 1st quality brick for outer walls. 4.5”thk 1st quality brick for inner walls.Base Level minimum 2'6" based-on Exiting Road Level |
Flooring |
24”X24” vitrified flooring for all rooms. 8”X 8” anti-skid ceramic tiles in toilets. 24”X24” Anti stain tiles in Kitchen. 24”x24” Rustic ceramic tiles in balcony. |
Wall tiles |
10”X14” ceramic tiles up to 7’0” height in toilets . 2’ ht dado ceramic tiles above granite platform in kitchen. |
Kitchen |
Black granite top kitchen platform with stainless steel sink |
Joineries |
Main Door : Seasoned Teak wood frame & door with Melamine finish. |
Bedroom Doors : Imported Padak wood frame & designed ready made doors finished with enamel paint. |
|
Toilet Doors : Imported Padak wood frame & FRP doors |
|
Windows : Imported Padak wood frames & shutters with enamel paint. |
|
Window Grills : MS flat window grills finished with zinc chromate non corrosive paint. |
|
Electrical |
Siemens Modular switches, Havells Multi strand copper wire and MCB’s and ELCBs. |
Provision for light, fan and power points. |
|
A/C point in all rooms. |
|
TV & telephone points in living. |
|
2 way points in all bedrooms. |
|
Provision for washing machine & geyser points. |
|
Sanitation |
Parryware / equalent EWC and wash basin in white/light color, Jaquar/equalent CP fittings with wall mixer. |
Health faucet will be provided. |
|
Wardrobe |
RCC wardrobe in bedrooms and shelves in kitchen without shutters. |
Painting |
Internal walls : Finished with emulsion paint On putty. |
External walls : Finished with exterior acrylic emulsion paint. |
|
Water Supply |
Bore well water in all tap points. |
Packaged drinking water from RO plant. |
|
Power Supply |
3 phase power supply with automatic change over switch in each flat. |
RMU transformer with advanced features. |
|
Others |
Lights in Stair, around the buildings and terrace will be provided. |
Bore well to a required depth. |
|
Compound wall around the building. |
|
Anti termite treatment as per norms. |
|
Underground sump. |
|
Sewage treatment plant. |
|
Lift |
8 passengers Johnson/equivalent lift with automatic rescue device. |